PARMIGNOLA BRIDGE
- CLIENT: Società Edilizia Tirrena spa
- PLACE OF EXECUTION OF THE WORKS: Marina di Carrara (MS)
- TOTAL AMOUNT: 200.000,00 €
- PERIOD OF EXECUTION OF THE WORKS: 2014
- SYNTHESIS: design, supply and installation of the bridge in steel structure on the Parmignola River site of Marina di Carrara (MS).